Spire Building Management Report for the Body Corporate - Period 7 February 2024 to 22 August 2024

Prepared by Gary Pettingill / Spire Building Manager

Last Committee Report date 07 February 2024

Building Manager Items for Discussion

Job No.CategoryShort Description
12
Intercom
Spire Many Multiple Apartments - Intercom Fault - Various Issues reported
141
Handyman
Discuss Spire Media / Cinema Room upgrade project. At least one quote & proposal has already been obtained. To be discussed for scope and budget at the next committee meeting on 22 August 2024.

Jobs with Committee for Discussion and Decision

Job No.Date LoggedCategoryJob SourceShort Job DescriptionCurrent Brief Status
592
2024-10-29
Handyman
Caretaker Identified
Damage to Queen Street Carpark Entry has occurred. Identify offender and report to the Body Corporate and Obtain quote for repair.
7/11/24 - Quote received from Rochele Painters - $4,083.55 8/11/24 - Sent incident report and details to SSKB. Peter is taking this one to the committee for approval to chase up the repair amount with the offender.
692
2024-11-14
Bin Chute
Caretaker Identified
BM identified a small amount of rubbish escaping the bin chute. Discussed with contractor who confirmed that he was aware of the hole and had photos which he shared.
03/12/24 - Ross from Drafting central attended and inspected the issues with me. He is going to consider a best proposal and quote to submit. He said ETA end of the week to provide the quote.
695
2024-11-15
Administration
Resident or Owner Reported
Resident reported 4 x oversized commercial bikes parked in the bike storage which restrict access to other bikes.
21/11/24 - At committee meeting they want me to approach the offender to discuss first. 05/12/24 - Awaiting access to CCTV computer - blocked due to other staff using this desk for last week.
697
2024-11-15
HVAC
Contractor Maintenance Identified
Level 40 Kitchen Aircon Control Panel is damaged.
28/11/24 - Assessed damage and how best to repair. Took photos. tricky as there is minimal contact point. I think I'll use a white bridge piece to glue to hold the bottom in. I will need to purchase something from Bunnings to suit.
886
2025-01-09
Fire
Contractor Maintenance Identified
Several Premier Fire Quotes received for general maintenance items. Quote Numbers 382770, 383543, 384228, 384229 and 384230 all refer.
09/01/25 - Emailed details to committee (via Peter & Amara at SSKB) with recommendation to proceed with these general items. Awaiting instruction.

Reportable New Jobs logged during report period (that remain open)

Job No.Date LoggedCategoryJob SourceShort Job DescriptionCurrent Brief Status
592
2024-10-29
Handyman
Caretaker Identified
Damage to Queen Street Carpark Entry has occurred. Identify offender and report to the Body Corporate and Obtain quote for repair.
7/11/24 - Quote received from Rochele Painters - $4,083.55 8/11/24 - Sent incident report and details to SSKB. Peter is taking this one to the committee for approval to chase up the repair amount with the offender.
687
2024-11-05
Electrical
Resident or Owner Reported
Lights for the Pool Area (in pool and all surrounds) are not working.
10/12/24 - Pool area lights are now working (confirmed). All pool internal lights are off due to power switched off pending identification of the model and ordering new lights to be installed (8x required). Likely will just order 11 so we have some spares. Emailed Poolwerx today for a quote to get in pool and remove existing lights so that they can be identified.
621
2024-11-06
Gates & Roller Doors
Repeat Maintenance
Arrange for Service of Spire 3 x building sliding gates
18/11/24 - I have scheduled Remote-A-Gate in for service on 11/12/24 (their first available date). Invoice received and forwarded to SSKB for 50% payment which is required in advance.
689
2024-11-08
Pool & Related
Contractor Maintenance Identified
Pool Electrolysis on RHS Chlorinator is non-functional. Poolwerx have acid cleaned the cells without any change.
3/12/24 - Installed new chlorinator. Tested with Electrician. Voltage levels remain excessive at between 12 and 16 Volts (all other chlorinator cells are between 2 and 3 volts). Did swap around testing no change. Suspect Chlorinator itself is faulty and will discuss with Pool contractor at next visit.
688
2024-11-13
Gates & Roller Doors
Caretaker Identified
Black Audi driver accidentally rolled his car into sliding gate to Carpark Level 2 (forgot to engage hand brake). Gate off rail.
18/11/24 - Work order confirmed with Remote-A-Gate for 11/12/24, first available date they can attend. Received invoice for the 3 gate service which will include this gate. Sent invoice and requested 50% payment by SSKB as required by Remote-A-Gate. Awaiting contractor.
692
2024-11-14
Bin Chute
Caretaker Identified
BM identified a small amount of rubbish escaping the bin chute. Discussed with contractor who confirmed that he was aware of the hole and had photos which he shared.
03/12/24 - Ross from Drafting central attended and inspected the issues with me. He is going to consider a best proposal and quote to submit. He said ETA end of the week to provide the quote.
693
2024-11-14
Fire
Contractor Maintenance Identified
Premier Fire have emailed new Fire Services Contract proposal. Review and liaise with the committee regarding.
09/01/25 - Quote request sent to Corporate Fire Services Qld. Await quote for comparison.
695
2024-11-15
Administration
Resident or Owner Reported
Resident reported 4 x oversized commercial bikes parked in the bike storage which restrict access to other bikes.
21/11/24 - At committee meeting they want me to approach the offender to discuss first. 05/12/24 - Awaiting access to CCTV computer - blocked due to other staff using this desk for last week.
696
2024-11-15
Fire
Caretaker Identified
Fire Penetrations Register administration. Unable to locate the register. Also need to ensure it is being done and scheduled according to required legal compliance.
27/11/24 - After follow-ups Premier Fire acknowledged my email and advised Brain will be getting back to me is this is his management area. Await further update.
697
2024-11-15
HVAC
Contractor Maintenance Identified
Level 40 Kitchen Aircon Control Panel is damaged.
28/11/24 - Assessed damage and how best to repair. Took photos. tricky as there is minimal contact point. I think I'll use a white bridge piece to glue to hold the bottom in. I will need to purchase something from Bunnings to suit.
788
2024-11-21
Cleaning
Contractor Maintenance Identified
Proposal put to the committee to consider a second "Windows Only" cleaning for the building. Contractor reports too much build-up of contaminants with only 1 clean per year.
27/11/24 - Access Pro advised work order received and work will be scheduled for 2025 and will advised once scheduled.

Reportable Jobs Closed During Reporting Period

Job No.Date LoggedCategoryJob SourceShort Job DescriptionCurrent Brief Status
95
2023-11-20
Plumbing
Contractor Maintenance Identified
Supply and install 2 x Stormwater pumps
24/09/24 - Two New Davey Stainless Stormwater pumps installed along with re-routing and upgrade of pipework. Job completed and great job by Planet Plumbing.
139
2024-02-24
Handyman
Caretaker Identified
Queen Street Footpath feature grip tiles / pavers by Queen Street Driveway entry are damaged and need replacing.
14/11/24 - Contractor returned today to finalise the repair work for this job. Work completed and job closed.
111
2024-03-12
Cleaning
Caretaker Identified
Offer Containers for Change / Express Recycling Refund program to the Body Corporate.
18/11/24 - New bins (x10) received today and organised. Broadcast message sent to all residents regarding use of. Weekly collection every Monday morning at approx. 10am. Job closed.
106
2024-04-18
Cleaning
Repeat Maintenance
Common Area Carpet Cleaning Due - Arrange quotes and have work done.
03/09/24 - Sten and Andy selected by the committee. Majority of work completed on 2/9/24 with remaining floors completed on 3/9/24. All soft furnishings and level 40 areas completed on 2/9/24 also. Work quality was OK - Just O.K.
133
2024-05-10
Handyman
Body Corporate Request
Stainless Checkerplate on Wall near ground floor to carpark
08/11/24 - Adrian attended and installed as quoted. Great result. Final cleanup of holding tape removed on 11/11/24. Job Done.
181
2024-06-14
Plumbing
Contractor Maintenance Identified
Sewer Sump - New Sewer Float Valve and Replacement Chain repair in confined space required.
24/09/24 - New Sewer float valve installed and new Stainless chain installed. Job completed and great job by Planet Plumbing.
160
2024-06-21
Administration
Body Corporate Request
Sell tow / tug vehicle under direction of the committee.
11/10/24 - Key was found earlier and test drove tug. Working great from a small drive in the load dock area. Facebook Marketplace ad received a few low ball enquiries. One purchaser offered an amount that was accepted by the committee. After funds were confirmed by SSKB, the Tug collected along with charger on 11/10/24. Job Closed.
177
2024-07-09
CCTV
Caretaker Identified
Quote for Ground Level Mail parcel delivery area. For committee to decide if they would like a camera or not.
09/09/2024 - New Camera installed. Wide Angle for best result. Works great. Job Closed.
193
2024-07-24
Handyman
Caretaker Identified
Level Ground through to B1 Carpark - Hole cut in wire
09/09/24 - Adrian from Sprout attended and installed stronger galvanised wire mesh. Job Done.
229
2024-08-02
Fire
Contractor Maintenance Identified
Premier Fire Pty Ltd Quotation 376707 - New Adjustable differential pressure switch and related works for Fire Sprinkler System
18/11/24 - Finally received reply from Premier Fire advising that this work was completed on 13/11/24 as per quotation. Job Closed.
298
2024-08-23
Plumbing
Caretaker Identified
Notice received last week that Water will be shutoff to building overnight 2 to 3 September 2024 by Urban Utilities contractor for repairs. Ensure building is taken care of and shutdown doesn't negatively affect building plant, notify all residents etc.
05/09/24 - RPGS successful completion of works by 03/09/24 and water back on. Several residents reported no hot water. Investigations and decisions and instructions to all residents sent regarding resolution. Job Completed.
299
2024-08-26
HVAC
Contractor Maintenance Identified
Investigate issue with Ground to B3 Basement Extraction and Ventilation fans - not operating when calibration attempted by Aegis when testing CO2 Levels. Premier HVAC Reported via email and needs to attend to assist Aegis to resolve.
17/9/24 - Premier HVAC attended with AEGIS. VSD for B1 to B3 exhaust fan found faulty. Separate job logged for this issue. Job Closed.
328
2024-09-02
HVAC
Resident or Owner Reported
Building Aircon is receiving many resident complaints. This morning it appeared more normal I was hoping to leave it for Wednesday's scheduled maintenance. Now this afternoon it is clear at least 2 out of 3 chillers are non-functional / having issues.
31/10/24 - Premier HVAC attended and installed new wiring loom and new fan into chillers, Ran through other problems due to these problems awaiting repair and confirmed all working normally and reporting normally on the BMS. All chiller stages are back online and operating normally!!! Woohoo, just in time for a hot summer.
389
2024-09-10
Electrical
Caretaker Identified
RCD Testing, Switchboard Thermal Scanning and Test and Tag required. Have annual inspection conducted and report created for the Body Corporate.
20/11/24 - All work and reporting has been completed and SSKB have been provided all reports. Job closed.
392
2024-09-12
Locksmith
Resident or Owner Reported
3106 - Mortice Latch failure to front apartment door. Locksmith attendance required urgently.
13/9/24 - Able attended promptly, able to gain access and replace mortice latch. Job Done.
398
2024-09-16
HVAC
Contractor Maintenance Identified
During maintenance by Premier HVAC on Monday 16/09/24, Corey identified no Basement fan operation. Testing showed that the massive Basement fan is reporting normally. Large VSD Driver for the fan is dead and needs replacement. Quote received on Tuesday 17/09/24 and forwarded to SSKB for Committee voting.
04/10/24 - Corey from Premier HVAC attended and installed new large VSD as quoted. All now up and running and Basement fan power and control now back to normal.
397
2024-09-17
Handyman
Caretaker Identified
Wire Mesh to Level 1 bike area - Vandalism / Intruder / theft? CCTV Investigation required.
14/11/24 - Contractor is continuing work today proceeding with the mesh upgrade to help fortify the area. Work has now been completed. Excellent result.
399
2024-09-17
HVAC
Caretaker Identified
Neighbour on Clark Lane, Indie School complained of Exhaust pipe fume emissions timing. Asking if timing can be modified.
30/09/24 - Met with Kim Cohen, Head of School, Indie School. Discussed concerns and she mentioned a few times through the day that she'd like to avoid running of the pumps. Later spoke with Premier Fire about the testing and they can't do before 8.30am, but will avoid doing after 3.00pm as best they can.
554
2024-10-23
Plumbing
Caretaker Identified
Many apartment PRV is leaking - replace with same PRV type as used on previous jobs.
31/10/24 - Justin from Mastertrade attended. Most valves replaced OK. However, outstanding issues which Tony will get back to me on. 2308 is leaking from master stop valve (requires building water draining to replace). 2309 tested OK no replacement, 2208 tested OK no replacement. 2209 replaced as faulty. Await further update from Tony. Will need to get quotes and discuss the outstanding fault for 2308 with the committee at upcoming committee meeting. 11/11/24 - New Job No. 654 added to manage the 2308 isolation valve job. This job now closed.
588
2024-10-28
Electrical
Contractor Maintenance Identified
Replace two RCBOs that failed electrical testing on 25/10/24
30/10/24 - Replacement RCBOs installed. Job complete.
594
2024-10-31
Cleaning
Caretaker Identified
3610 resident spat in Lift 1 on two occasions.
31/10/24 - Cleaning invoice issued to the Property Manager. Also sent details to SSKB should they wish to take further action. PM has confirmed that a breach notice was issued. Job Closed.

Reportable Current & Incomplete Jobs

Job No.Date LoggedCategoryShort Job DescriptionCurrent Brief StatusJob Source
65
2023-06-26
Tiling
Level 40 Pool tiling
21/11/24 - Work to be scheduled after School holidays in April with a Target of early May 2025 – as per 21/11/24 committee meeting. Bring-up appointment added to Calendar for 4/3/25 to revisit quotes and arrange from there.
Caretaker Identified
161
2024-06-13
Gardening
Spire 608 - Soil in Courtyard is low and needs topping up. (Common area of building)
28/11/24 - Sent email to SSKB for committee vote as budget agreed at the last committee meeting will not be satisfactory. Provided 2 options (quoted vs hourly rate with a limit) for decision. Await committee discussion and vote.
Resident or Owner Reported
183
2024-07-19
Abseiling
Metal Dressing Shroud around external building pillars is rattling in high winds. Not a new issue. Making note so that I can discuss this problem and recommendation to resolve going forward if the committee wish to proceed. Apartments 3602 and 3202 both making recent complaints regarding.
22/08/24 - Committee wish to continue monitoring this and gain more audible evidence for sharing with the committee so that they can understand the problem better. 1/11/24 - New directional microphone has been purchased as is with the BM. Discussed with the PM team for next time we have a complaint I can go and record the sound and get some audio to share with the committee. A register will also be kept of those reporting concern.
Resident or Owner Reported
291
2024-08-20
Lifts
Lifts require upgrade from 3G to 4G Modem / Comms equipment due to shutdown of 3G network on 01/09/2024. Due to plan selected by the Body Corporate the upgrade comes at additional expense instead of included as it was on the longer plan options. Urgent as shutdown is planned in 10 days. Quote received today (21/08/2024) from Schindler and forwarded to SSKB for committee.
02/12/24 - Checked in with Mark from Otis regarding an ETA. They are currently just swamped due to big flooding storm over the weekend. Awaiting work scheduling.
Contractor Maintenance Identified